What code 5022 covers

  • Laying concrete block, brick, stone and glass block; installation of lintels and precast sills by the masonry crew.
  • Mixing, tending, scaffolding and cutting for the masonry crew.
  • Masonry repair, tuckpointing and restoration.
  • Crew helpers and laborers.

What it does not cover

  • Poured concrete work, footings, slabs and tie beams (5213, 5221), where records separate it.
  • Stucco applied to the finished wall (5480).
  • Stone or tile setting as interior finish (5348).
  • Clerical and outside sales (8810, 8742) for employees who do nothing else.

How the Division assigns it on a stop-work order

On a stop-work order worksheet, the investigator assigns a class code to each uninsured worker for each period from two sources: the employer's records (payroll by job, job descriptions, invoices, permits) and the investigator's own observation on the jobsite. With no records, Rule 69L-6.028 directs the Department to impute payroll at the highest-rated class code the investigator observed. Block stacks, mixers and scaffolding on a slab identify the crew. The same crew pouring the tie beam is 5213 for those hours if the records separate it; otherwise the higher-rated code governs all hours. Under the NCCI basic manual the governing class is the one with the most payroll, and an employee's payroll is assigned to a single code unless the records separate it by operation; interchange-of-labor splits require contemporaneous payroll records, not after-the-fact estimates. Getting a worker moved from code 5022 to a lower-rated code is a records argument, made line by line on Form DFS-F4-1595.

Misclassification patterns the investigator looks for

  • A masonry 'subcontractor' that is one exempt owner and an eight-man crew paid cash by the block: an uninsured employer for eight, and the builder is liable for all eight under s. 440.10(1)(b).
  • Crew members 'leased' from a labor company that has no Florida policy or whose policy does not list them: uninsured employees of whoever pays them.
  • Tenders and mixers coded as general labor: all masonry crew payroll is 5022.

Clerical (8810) and outside sales (8742) are standard exception codes. A worker's payroll goes there only if their duties are exclusively clerical or sales and the records show it. An office manager who also runs materials to the jobsite, or an owner who sells jobs and swings a hammer, is assigned to the governing construction class for all of their payroll. This is the single most common reclassification on a penalty worksheet.

The rate

Florida's approved manual rate for this code is filed by NCCI and approved by the Office of Insurance Regulation effective each January 1. The Department's worksheet uses the rate in effect for each period of non-compliance, so a 24-month lookback can span three rate years. Rates are not stated on this page because they change; your agent, carrier or the current NCCI Florida rate pages have the figure. The free calculator takes the rate as an input.

Why 'construction' matters

Rule 69L-6.021, F.A.C. lists code 5022 as a construction industry classification. That means one employee triggers the coverage requirement (s. 440.02(20)(b)2), no more than three exempt officers per company or affiliated group (s. 440.02(18)(b)2), and a $50 fee for each officer exemption (s. 440.05(8)(a)).

Served with a worksheet that rates your crew at code 5022? We audit it line by line before anything is produced.

(850) 766-6825Pre-submission audit

Questions

My block sub showed me a certificate of insurance. Is that enough?+

Verify it on the Division's proof-of-coverage database, confirm the policy is a Florida policy or Florida-endorsed, confirm the named insured is the entity you pay, and keep the copy as s. 440.10(1)(c) requires. A certificate for a different entity or a lapsed policy makes you liable for the crew.

Is masonry construction under Chapter 440?+

Yes. Rule 69L-6.021 lists 5022 as construction, so one employee triggers coverage and exemptions are limited to three officers per company.

Was this page helpful?

Free consultation, 24/7

Tell us what happened. We answer around the clock.

Every message goes straight to Adrian Middleton's phone. If the investigator is still on your site, do not fill out a form: call or text the cell and put Adrian on the line with them.

  • · Do not hand over records until you know what is in them.
  • · Do not give a statement to the investigator without counsel.
  • · Do not keep working on the job site after the order is posted.

Sending this form does not create an attorney-client relationship. Do not include confidential details until we have spoken.